登录注册
Sun Dec 22 18:55:03 CST 2024 会员服务 用户名: 密码: 注册  忘记密码 客服电话:4006728810 首页 法律咨询 案件委托 找好律师

合同文规库

您当前的位置:法律家首页>>合同文规库>>合同范本详情页

Facilities Use Agreement

租赁合同-机械设备租赁合同  |  2015-07-24 22:13:13.507


  This Facilities Use Agreement Number _________, (the 'Agreement') is made and entered into as of this _________,_________,_________(M/D/Y) by and between the AAA (the 'Government') and BBB (the 'Contractor') (hereinafter collectively referred to as the 'Parties').
  RECITALS
  WHEREAS, the Government is the owner of certain real property located in _________, more particularly described in Schedule A, attached hereto and incorporated herein by reference (the 'Property'): and
  WHEREAS, the Government desires to provide the Property to the Contractor, and the Contractor desires to use the Property for the purpose of performing services for the Government in connection with the Amphibious Assault Vehicle (AAV) Reliability, Maintainability, Sustainability/Rebuild to Standard program; and
  WHEREAS, providing the Property will facilitate the Government's procurement of essential services and promote the national defense; and
WHEREAS, providing the Property will support the Government's industrial preparedness programs and is in the public interest,
  NOW THEREFORE, in consideration of the mutual promises and conditions set forth herein, the Government and the Contractor hereby agree as follows:
  I. PROVISION OF PROPERTY
  A. Provision. The Government hereby provides the Property to the Contractor and the Contractor hereby agrees to use the Property in accordance with the terms and conditions set forth in this Agreement.
  B. Use of Property. The Contractor is authorized to occupy and use the Property in performance of the requirements in Contract M67854-98-C-2075, which was awarded by the Marine Corps Systems Command (the Contract), and for such other uses as authorized by the Government.
  C. Term, Option to Extend, and Termination. Notwithstanding any provision to the contrary herein or in the FAR, the term of this Agreement shall be for a period commencing on the date first written above and ending on _________,_________,_________(M/D/Y). However, the parties hereto may by mutual written agreement, extend the use of the Property under this Agreement beyond _________,_________,_________(M/D/Y) to permit completion of the contract or subsequent related contracts. Furthermore, notwithstanding the Government's absolute right to terminate this Agreement at any time, the Government will, to the extent practicable, provide the Contractor with 180 days advance written notice prior to terminating this Agreement.
  D. Rent. As provided in FAR 52.245-9(a), the Contractor shall have no obligation to pay any rent to the Government provided the Contractor only performs work under the Contract.
E. Annual Review. The Parties agree that they will periodically review this Agreement (but not less than annually) to ensure that it continues to meet their respective needs.
  II. SPECIAL PROVISIONS.
  A. Reasonable Access for Contractor. The Government agrees to permit the Contractor reasonable access to the Property and to place no unreasonable encumbrance upon the free use and enjoyment of the Property by the contractor's personnel, authorized visitors, or any other individuals having a reasonable need to enter the Property.
  B. Provision of Utilities and Support Services. The Government shall make available to the Contractor, on a reimbursable basis, the following utilities and services in connection with the Contractor's use of the Property, and the Parties hereto shall enter into a separate agreement concerning the Government's provision of such utilities and services and the Contractor's payment therefor.
  Water Electricity
  Sewage Natural Gas
  Miscellaneous Maintenance Entomology Services
  Building Maintenance Refuse Collection
  Emergency Ambulance Service Hazardous Waste Disposal
  In addition to the foregoing, the Government shall make available to the Contractor, at no cost, the following services in connection with the Contractor's use of the property:
  Security Fire Protection
  Safety Intra-base Mail
  Guard Service (Gate)
  C. Parking. The Government agrees to provide the Contractor with ten parking spaces adjacent to the Property as indicated in Schedule B. In addition, the Government will provide the Contractor with access to additional parking in close proximity to the Property.
  D. Installations, Arrangements, Rearrangements, Modifications and Construction. The Contractor may, at its own expense, construct or install any fixed improvements, structural alterations or modifications, or install such capital equipment on the Property as may be necessary to perform its obligations under the Contract. This shall include, but is not limited to, bringing utilities to the Property and providing for the separate metering thereof, making architectural/ structural, mechanical, electrical, or other renovations or alterations to the Property; and, making improvements (including stabilization and drainage) to any open storage areas. The Parties acknowledge and understand, however, that at the expiration or earlier termination of this Agreement, the Contractor may remove any capital equipment that it provided and installed on the Property to perform its obligations under the Contract. However, if the Contractor removes any such capital equipment then the Contractor agrees to restore that portion of the Property vacated by said equipment to a condition such that the Property may once again be used for its original purpose as a storage warehouse.
  E. Periodic Inspections. The Government reserves the right to perform periodic preventive maintenance, fire protection and other inspections of the Property. This shall include, but not be limited to, the Government's right to perform environmental compliance and explosive safety inspections.
  F. Contracting Officer's Representative. The Contracting Officer shall designate in writing a Contracting Officer's Representative (hereinafter 'COR') to insure that the Parties comply with the terms and conditions of this Agreement.
  G. Condition of Property. The Government makes no warranty, express or implied, regarding the condition or fitness for use of the Property.
  H. Compliance with Laws.
  1. General. The Contractor, at its own expense, shall conduct its activities on the Property in compliance with all applicable laws, regulations, rules, orders, decrees, permits and agreements, including without limitation those promulgated by the Department of Defense or any division or related agency thereof, and including without limitation those which relate to health, safety, environmental protection, waste disposal, and water and air quality with respect to the use of the Property and the rights granted hereunder (all of which are hereinafter referred to as the 'Requirements'). Further, the Contractor shall conduct its activities in compliance with all requirements to which the Government may be subject with respect to the Property. The Parties agree that to the extent existing Requirements are changed or new Requirements are imposed during the term of this Agreement, both parties retain the right to seek an equitable adjustment or other appropriate change under the Contract as may be permitted by law.
  2. Cooperation in Obtaining Permits. The Contractor shall, at its own expense,obtain any and all permits, licenses, and other authorizing documents as may be necessary for the use and possession of the Property, provided the Government cooperates with and gives its best efforts to the Contractor to the extent reasonably necessary for the contractor to obtain such permits,licenses, and other authorizing documents. Hazardous waste may be disposed of under MCLB Albany's Environmental Protection Agency identification number on a reimbursable basis.
  3. Government Disapproval of Contractor Actions. If the Government fails to reasonably approve or allow any action that the Contractor has identified as reasonably required to meet its obligations under this section then the Contractor shall be relieved of its obligations pursuant to this section for such action and any resulting conditions arising from the failure to take such action.
  I. Environmental Investigation and Remediation.
  1. Potential for Contaminat

........................

版权所有:法律家科技集团 运营维护:法绿家科技(北京)有限公司
用户登录